Busby Group were proud to be involved in the Moranbah North Power Station for Clarke Energy.

This work involved the full civil construction of a 45 mega watt seam gas powerstation. Works included cut to fill & imported fill for the road construction and pavement.

Other works were 2 x dam constructions including HDPE Liner, drainage structures and gully pits, sediment traps, pump out pits, spoon drains, sediment ponds and underground drainage. Concrete structures included 15 engine bases; a 250m2 gas conditioning pad; various pedestals/plinths; bulk oil pads and transformer pads; and full workshop construction including all electrical & plumbing works. Also included were 900 lineal metres of security fencing & Armcorail. Approximately 1000m3 of concrete was used on this job.

View the full advertisement – pdf 632kb